The fuel (CWM) according with boiler request is pumped into the burner through the slurry tank, the supply slurry pump, the filter, the high-pressure wind and the special-made gun, CWM burns in the furnace independently under the condition of the oil ignition system assistance.
The smoke is vented from the bottom of the boiler through the boiler burn chamber, the convection pipelines, the economizer etc, and then through the special dust catcher for desulphurization and dedusting to reach the environment standard. Finally, it is discharged into the atmosphere by the exhausting blower through the chimney. The very little slag is discharged out of the boiler by the slag-discharging system.
Contact Us
Tel:+86 532 85201288
Â
Â
Fax:+86 53283232277
Glazed Tile Roll Forming Machine
Roof & Wall Roll Forming Machine Co., Ltd. , http://www.wallrollformingmachine.com